Home Uncategorized Sarasota Memorial Health System Radiation Cancer Center

Sarasota Memorial Health System Radiation Cancer Center


The new Sarasota Health Care System’s new Radiation Radiation Cancer Center completes the first phase of the Brian D. Jellison Cancer Institute. To support the Cancer Institute’s vision to provide a comprehensive, continuum of care, the new cancer center in Sarasota, Fla. Provide patients with access to top-of-the-line radiation treatments, including external radiation services, in a comfortable, spa-like environment dedicated to cancer care.

The 18,000 square foot facility is equipped with two Varian TrueBeam linear accelerators that accurately identify tumors, removing healthy cells from unnecessary radiation. This innovative technology ultimately facilitates faster treatments, shorter recovery times, and improved results. The center also includes a CT simulator for radiation therapy, six clinics, a doctor’s office, and an integrated care suite.

Informed by critical feedback from hospital user groups and community members, the facility is planned to focus on the entire patient population by integrating cutting-edge technology with care elements. health like serene gardens and supportive service sets. Filled with ample natural light, thoughtful artwork and natural materials, the center is designed to provide a calming care experience, from the moment the patient enters the door until they are finished. final round of treatment – a welcome alternative to traditional oncology centers.

Patients, families and staff are also given the opportunity to physically access outdoor activities. At the end of the hall space is a direct view of the water ritual area with natural areas outside as the backdrop. The surrounding courtyard features water allowing those who visit the space to rest and meditate.

Project item: New construction

Manager: Lorrie Liang, president, Sarasota Memorial Hospital – Sarasota Campus

Sure: Flad Architects, www.flad.com

Design team: Flad Architects (medical programming, interior design, landscape architecture, and package architecture design services); Associate engineer (MEP engineer); Charles Perry Partners (construction manager); Stantec (construction engineer); Walter P. Moore (structural engineer); Samdahl et al (business and operations planner)

Total building area (sq. Ft.): 18,000

Construction cost / sq. ft: $ 678

Total construction cost (excluding land): 12.2 million dollars

Accomplished: August 2020

RELATED ARTICLES

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Most Popular

Recent Comments